The fleet · every page, one screen
EVERYTHING IS PARKED HERE.
The whole lab, grouped by line, one line each. Showing someone around?
This is the page to open — isightlabs.netlify.app/hangar.
Nothing matches — clear the filter to see the whole fleet.
START HERE THE FRONT DOORS
THE MAPS HOW IT ALL CONNECTS
MIND MY MATERIAL THE CHARACTERIZATION LINE
BOOKS ON THE DRAFTING TABLE
HINDSIGHT 80/20 THE INSTRUMENT LINE
Why Hindsight Wins STORY
The product story — and the clickable data economy embedded at full length.
The Fatigue Analysis TECH
The damage ledger explained — D(t), rates, and your inspection date.
Quit / Stay TECH
The decision read: when the record says hold, and when it says go.
The 80/20 Framework DOC
The rule the whole toolkit answers to: small burden, four-fold return.
The Repair Bay FEATURE
Two logbooks, coupon tests, and credit only for surprise — recovery, run like maintenance.
The Maintenance Loop FEATURE
Hard days come in chains, the week is a load cycle, and recovery can be timed — what 2,494 nights taught, and the three gauges in Hindsight Daily v5.0.
Zones of Criticality TECH
Regions I, II, III on the crack-growth curve — which one you are standing in, and gold/silver/bronze for how much to trust the read.
LAB NOTES ONE INSTRUMENT, ONE FINDING, ONE IDEA
The weekly note, filed. Each one is engineering that happens to be a mirror.
𝑖SIP TASKS THE PROGRAM, STATION BY STATION
Task 0 grounds authority; I declares the mission; II measures the loads; III inspects; IV manages the envelope; V audits deep.
Authority Trace TASK 0
Who has been flying your aircraft — the trace that grounds the program.
Domains of Truth TASK 0
Worksheet 0-B — how good is the data behind that belief? Six rungs, three kinds of true, one rule.
Mission Declaration TASK I
You assign the design mission — in writing.
Governor Criteria TASK I
The limits that keep the mission honest.
Joint Inventory TASK I
Where your structure connects — and where it concentrates stress.
Converge to Diverge TASK I–II
Design information & analysis — two mirrored waves build the wall of an engine.
Converge Worksheet TASK I–II
The printable worksheet for Converge to Diverge — fill it in, keep it.
Career Load History TASK II
The loads your career actually put through the structure.
Loads Evaluation TASK II
The interactive free-body diagram — every force on you, drawn.
Stress Flow TASK II
Worksheet 2-D — five drawings of one sheet: flawless, a hole, a sharp step, a radius, a crack. Where the lines crowd, that's where it breaks.
Modal Survey TASK III
Find your resonant modes before they find you.
Findings Register TASK III
What inspection turned up, logged like it matters.
Envelope Management TASK IV
Operating limits, managed — not merely survived.
The 𝑖SRM TASK IV–V
The growing repair manual — certified procedures, earned in the Repair Bay.
ACI Deep Audit TASK V
The teardown inspection — what routine looks never reach.
IN-HOUSE THE LAB'S OWN INSTRUMENTS · NOT FOR SALE